What's a good OEE score?

Everyone wants one number. The honest answer has a few caveats — and those caveats are the difference between an OEE program that improves the plant and one that just games a dashboard.

The short answer

If you only remember three numbers, remember these.

85%
World-class OEE. 90% availability × 95% performance × 99.9% quality — the target Seiichi Nakajima set under TPM.
55–60%
Typical OEE. Where most plants actually land once you measure honestly.
~6%
Reach world-class. Share of plants at 85%+ on a yearly average — likely closer to 3% once calculation errors are stripped out.

So a "good" OEE isn't 85%. For most sites, a good OEE is a number climbing quarter over quarter, measured the same way every time. The gap between where you are and 85% is real — but the plants that close it do so by beating their own last number, not a figure from a blog.

OEE benchmarks by industry

Directional ranges, not gospel. Use them to sanity-check whether you're in the right neighbourhood — not as a target handed down from outside.

IndustryTypical"World-class"Why it differs
Discrete / machining (CNC)60–72%80–85%Frequent changeovers and high product mix eat availability.
Automotive assembly (Tier 1)75–82%85–90%Dedicated lines and mature TPM — the environment 85% was built for.
Food & beverage55–78%80–85%Huge spread: high-mix ready-meals sit low; dedicated bottling runs high.
Continuous process (chem/paper)80–90%92%+Runs uninterrupted once started, so availability is structurally high.
Pharmaceuticals55–70%~70%Validation, cleaning and regulatory holds cap the ceiling by design.

Ranges synthesised from multiple industry datasets and TPM literature. Global distribution figures (55–60% average, ~6% at world-class) from Evocon's dataset of 3,500+ machines across 50+ countries; the 85% definition from Nakajima / OEE.com and Lean Production.

Why comparing across industries is a trap

Three reasons the neat table above can quietly send you the wrong way.

The rule that survives all of this: compare your line to itself, measured the same way, over time. A CNC cell going 58% → 64% → 69% is winning. A bottling line stuck at 84% while quietly redefining its denominator is not.
Read next: why the OEE your plant reports probably isn't the one that matters →

Where does your line sit?

Enter your three OEE factors and pick your industry. The gauge shows your score; the bar places you against that industry's real-world range.

%
%
%
79%YOUR OEE
CNC — typical 60–72%0 → 100%
0255075100
Open the full OEE tool — save or share your result →

Chasing the wrong benchmark is expensive. Want a read on where your real gains are hiding?

Get in touch →
Bharat Kumar · Manufacturing Transformation & Operational Excellence